Evaluation of worker productivity improvement using ISM and FAHP

Added Title

IEEM 2007
IEEE International Conference on Industrial Engineering and Engineering Management (2007)

College

Gokongwei College of Engineering

Department/Unit

Industrial Engineering

Document Type

Conference Proceeding

Source Title

IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management

First Page

109

Last Page

113

Publication Date

12-1-2007

Abstract

In recent years, many printed circuit board manufacturing firms have looked upon worker productivity improvement as the means by which they can improve their firm performance. This paper uses the critical factors and interpretive structural modeling to determine the structure of analytical hierarchical process model in fuzzy environment. Fuzzy analytic hierarchy process-based methodology was used to tackle the different decision criteria in a hierarchical structure in the improvement of worker productivity. The findings advocate that these manufacturing firms would thereby the hierarchical model to setup the priorities of the worker productivity improvement. And best practice, reduce unit cost and physical working environment are the crucial sub-factors for worker productivity improvement. © 2007 IEEE.

html

Digitial Object Identifier (DOI)

10.1109/IEEM.2007.4419161

Disciplines

Industrial Engineering

Keywords

Industrial productivity—Measurement

Upload File

wf_no

This document is currently not available here.

Share

COinS