Improving imported project cargo logistics through inter-business units collaboration
Date of Publication
10-19-2019
Document Type
Insider Action Research
Degree Name
Master of Business Administration
Subject Categories
Business Administration, Management, and Operations
College
Ramon V. Del Rosario College of Business
Department/Unit
Management and Organization
Thesis Adviser
Jaime Cempron
Defense Panel Chair
Pia Manalastas
Defense Panel Member
Angelique Blasa
Patrick Adriel Aure
Abstract/Summary
The purpose of this integrative action research (IAR) is to eradicate the silo- culture of departments in any organization. As every organization aims to be effective with all its operations, inter-departments must learn to appreciate the need for synergy, collaboration and teamwork. All these are very much needed in driving improvements and doing change management in an organization. In this IAR, objectives of instilling change, process improvements and collaboration were achieved. To make things better, all these changes gave positive impact with its costs wherein it was decreased through two (2) months’ time from the action research (AR) cycles with Construction, Planning, Action and Evaluation stages. The AR cycles were primarily guided with ADKAR change model. Then, through extrapolation, Lewin’s 3- Stage model of change was eventually utilized at is correlated with ADKAR. AR Cycle 1 covers determining the process steps that in order to resolve the non-collaboration and incremental costs concerns. AR Cycle 2 then caters the further management and recovery of the incurred incremental costs, and strengthening desire of the collaborative meetings injected in the launched process flows for the imported project cargo logistics for a manufacturing company. This action research dealt on the incremental costs in an importation process, costs that should not occur in an effective operation. These incremental costs must then be foreseen in order to prevent from happening, and be recovered in cases an organization incurred such costs already.
Abstract Format
html
Language
English
Format
Electronic
Accession Number
CDTG008072
Keywords
Interorganizational relations
Recommended Citation
Liao, J. E. (2019). Improving imported project cargo logistics through inter-business units collaboration. Retrieved from https://animorepository.dlsu.edu.ph/etd_masteral/6755
Embargo Period
7-11-2023