A systems study on the production department of J.F. Rubber Philippines, Inc.

Date of Publication

2006

Document Type

Bachelor's Thesis

Degree Name

Bachelor of Science in Industrial Engineering

Subject Categories

Engineering

College

Gokongwei College of Engineering

Department/Unit

Industrial and Systems Engineering

Thesis Adviser

Jazmin N. Chong

Defense Panel Member

Anna Bella Manalang-Siriban

Rumel V. Atienza

Abstract/Summary

J.F Rubber Philippines is a company that manufactures rubber parts for the automotive and electronics industries. It is located at the People's Technology Complex - Special Economic Zone in Carmona, Cavite. The system study is concerned with the company's production department, more specifically on the products that undergo compression curing. The products identified to have the highest output are the grommets, o-rings, and packings which are all automotive parts used as sealants and coverings for the car or motorcycle's electronic components.

The system exceeded its .25% target reject rate for compression by 2.36% during the year 2005. The company has therefore incurred Php9,653,914 in costs of rejects for the whole year. This is found to be the system's main problem. The main types of rejects that affect the products are Air Checks, Flow Cracks, Short Shots, Overtrim, Release Marks, Embedded Flashes and Deformation. After the evaluation of the probable causes, the identified causes for these rejects are Low Mould Temperature, Low Pressure, Improper Handling of Product While Still Hot, Improper Releasing Technique of Operator, Application of Too Much Silicone, Flashes and Foreign Materials in the Mould, Lack of Material Fed Into the Machine, and Operator Errors in Finishing.

The proposed solutions include the installation of an alarm system for the machines, man-machine charts with an assignment guide database, a rejects prevention guide, 100% weighing of its products, implementation of statistical process control, and a revision of the system's acceptance sampling method.

The computed net present value of the proposed solution is Php12,647,578 while the Php131,095 investment made is recoverable in 0.0318 years. Given these values, it shows that the proposed solutions for the main problem of rejects in grommets, o-rings, and packings are feasible to implement. Finally, when it comes to the implementation period, based on the Gantt chart that was constructed, these solutions can be applied within approximately 5 weeks.

Abstract Format

html

Language

English

Format

Print

Accession Number

TU13820

Shelf Location

Archives, The Learning Commons, 12F, Henry Sy Sr. Hall

Physical Description

ix, 286 leaves : ill. ; 28 cm.

Keywords

Rubber industry and trade--Philippines; Production management

This document is currently not available here.

Share

COinS