A system study on the electrical installation of ANVIC Construction Philippines Inc.
Date of Publication
2015
Document Type
Bachelor's Thesis
Degree Name
Bachelor of Science in Industrial Engineering
Subject Categories
Industrial Engineering
College
Gokongwei College of Engineering
Department/Unit
Industrial and Systems Engineering
Thesis Adviser
Dennis E. Cruz
Defense Panel Chair
Anna Bella S. Manalang
Defense Panel Member
Ronaldo V. Polancos
Abstract/Summary
ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanship non-conformances which results to rework cost of Php2,698,718.26.
To address this problem a why-why diagram was used to analyze the cause of the problem in each of the 6 projects. It was determined that they experience these problems because of the poor progress monitoring of each project, the lack of supervisory and management skills of higher level managers, and the poor inventory management being implemented by the company.
The solutions that were chosen after performing the Kepner Tregoe decision analysis was the monitoring using the Kanban system, providing training and sending foremen to seminars, and implementing an inventory management and tracking system that will ensure that all raw materials would be present in time for scheduled installation.
By implementing of the proposed solutions, the company would be able to reduce and eliminate their problem of incurring rework due to workmanship. Furthermore, all proposed solutions can be implemented within 3 months. It was computed that the processed solution have a net present value of Php2,632,118.26.
Abstract Format
html
Language
English
Format
Accession Number
TU17389
Shelf Location
Archives, The Learning Commons, 12F, Henry Sy Sr. Hall
Physical Description
275 leaves: illustrations (some color); 29 cm.
Keywords
Engineering systems; Industrial engineering; ANVIC Construction Philippines Inc
Recommended Citation
Co, L. C., Constantino, M. M., & De Guzman, C. L. (2015). A system study on the electrical installation of ANVIC Construction Philippines Inc.. Retrieved from https://animorepository.dlsu.edu.ph/etd_bachelors/7274