A system study on the electrical installation of ANVIC Construction Philippines Inc.

Date of Publication

2015

Document Type

Bachelor's Thesis

Degree Name

Bachelor of Science in Industrial Engineering

Subject Categories

Industrial Engineering

College

Gokongwei College of Engineering

Department/Unit

Industrial and Systems Engineering

Thesis Adviser

Dennis E. Cruz

Defense Panel Chair

Anna Bella S. Manalang

Defense Panel Member

Ronaldo V. Polancos

Abstract/Summary

ANVIC Construction Inc. was established in January 24, 1985 to engage in construction and engineering services. The study specifically focuses on the installation process of the company from January 2013-June 2014. Based on its present system and SWOT analysis, the company is experiencing workmanship non-conformances which results to rework cost of Php2,698,718.26.

To address this problem a why-why diagram was used to analyze the cause of the problem in each of the 6 projects. It was determined that they experience these problems because of the poor progress monitoring of each project, the lack of supervisory and management skills of higher level managers, and the poor inventory management being implemented by the company.

The solutions that were chosen after performing the Kepner Tregoe decision analysis was the monitoring using the Kanban system, providing training and sending foremen to seminars, and implementing an inventory management and tracking system that will ensure that all raw materials would be present in time for scheduled installation.

By implementing of the proposed solutions, the company would be able to reduce and eliminate their problem of incurring rework due to workmanship. Furthermore, all proposed solutions can be implemented within 3 months. It was computed that the processed solution have a net present value of Php2,632,118.26.

Abstract Format

html

Language

English

Format

Print

Accession Number

TU17389

Shelf Location

Archives, The Learning Commons, 12F, Henry Sy Sr. Hall

Physical Description

275 leaves: illustrations (some color); 29 cm.

Keywords

Engineering systems; Industrial engineering; ANVIC Construction Philippines Inc

This document is currently not available here.

Share

COinS