Modeling road construction project cost in the Philippines using the artificial neural network approach

Added Title

IEEE International Conference on Humanoid, Nanotechnology, Information Technology, Communication and Control, Environment, and Management (11th : 2019)
HNICEM 2019

College

Gokongwei College of Engineering

Department/Unit

Civil Engineering

Document Type

Conference Proceeding

Source Title

2019 IEEE 11th International Conference on Humanoid, Nanotechnology, Information Technology, Communication and Control, Environment, and Management, HNICEM 2019

Publication Date

11-1-2019

Abstract

Incomplete data and several unforeseen factors affect the accuracy of project cost estimates, especially during the conceptualization stage. When stakeholders need an immediate estimate of the budget for a project, in-depth cost analysis may take time, sacrificing resources for feasibility studies. In the Philippines, a more effective and efficient early cost estimation method is recommended to ensure proper utilization of government funds. In this paper, the artificial neural network technique was adopted to model the local total road project cost. Data collection included 41 road projects with each having 15 factors were recorded, namely: road type, location (region), length of road, duration of project, capacity, pavement thickness, pavement width, shoulder width, earthworks volume, average site clearing/grubbing area, presence of water body, soil conditions, surface class, gross domestic product and consumer price index. After correlation analysis, 7 input variables were finalized. These are the soil condition, surface class, gross domestic product, presence of water body, pavement width, road type and capacity. Several simulations were performed in MATLAB software to determine the best total road project cost model. The best neural network architecture consists of 7 input variables, 12 neurons in the hidden layer and 1 output variable. This neural network model satisfactorily predicted the total cost with coefficient of correlation values of 0.97168, 0.95188, and 0.99036 for training, validation and testing phases, respectively.

html

Digitial Object Identifier (DOI)

10.1109/HNICEM48295.2019.9072820

Disciplines

Civil Engineering

Keywords

Roads—Design and construction—Estimates--Data processing

Upload File

wf_yes

This document is currently not available here.

Share

COinS