P-graph approach to human resource reallocation in industrial plants under crisis conditions

Added Title

International Symposium on Advanced Control of Industrial Processes (6th : 2017)
AdCONIP 2017

College

Gokongwei College of Engineering

Department/Unit

Chemical Engineering

Document Type

Conference Proceeding

Source Title

2017 6th International Symposium on Advanced Control of Industrial Processes, AdCONIP 2017

First Page

131

Last Page

136

Publication Date

7-18-2017

Abstract

P-graph methodology was originally proposed as a systematic approach to process network synthesis (PNS). However, this graph theoretic approach has also been applied to a broad range of problems with similar structure as PNS. In particular, recent work has demonstrated the similarity of PNS problems to input-output (IO) optimization problems; the latter class of problems has been applied for physical flows at scales ranging from process plant level to supply chain level. IO models have also been proposed to plan the allocation of human resource in organizations. In this work, a P-graph based approach to reallocation of human resources in an industrial plant during a transient crisis is presented. The model determines how personnel can be reassigned to allow a plant to operate at an alternative temporary steady state when the plant becomes short-handed due to a disruptive external event. This methodology is demonstrated using a representative case study involving an instant coffee plant. Results show that in the occasion that a reduction in available workforce is experienced, workforce is allocated in more critical areas and productivity is maximized by minimizing interaction with less critical departments.

html

Digitial Object Identifier (DOI)

10.1109/ADCONIP.2017.7983768

Disciplines

Engineering

Keywords

Manpower planning

Upload File

wf_yes

This document is currently not available here.

Share

COinS