A system study on the production department of Titan Rubber Industrial Manufacturing Corporation
Date of Publication
2008
Document Type
Bachelor's Thesis
Degree Name
Bachelor of Science in Industrial Engineering
Subject Categories
Engineering
College
Gokongwei College of Engineering
Department/Unit
Industrial and Systems Engineering
Thesis Adviser
Jose Edgar Mutuc
Defense Panel Member
Rumel Atienza
Abstract/Summary
Titan Rubber Manufacturing Company, Inc. has been able to make a name in the manufacturing of automotive weatherstrips of metal and nonmetal in the country throughout 20 years. Its mission is to be of service to the Filipino and other global markets by producing and supplying world-class and high-quality products.
The production system of the company is experiencing opportunity losses due to a total of 11.16% of unaccepted defects of weatherstrip with metal and 10.42% of unaccepted defects of weatherstrip without metal during 2007, which constitutes a total of Php 9,247.840.88 that year.
Using Cause-and-Effect and Pareto, the root causes that were proven to be contributing 80.30% to the reject costs are air check caused by inconsistent temperature, defective machine, and inconsistent pressure, improper handling of hot product, application of undesired amount of silicone on the mould, foreign matters and improper release techniques.
The solutions were proposed to address the significant causes of rejects include the creation of a warning alarm and lighting system, Preventive Maintenance Schedule for Machine and Backup Scheduling, Introduction of Standard Scooper and Applicator, refined reject recording system with incentive, and improvement of ergonomic and housekeeping conditions.
Using simple Cost-Benefit Analysis, the comparison between the total cost of implementation of proposed solution from the total expected annual savings resulted in a total net benefit of Php 4,610,407.25. The solutions are found to be feasible and ready to be implemented within a span of two months.
Abstract Format
html
Language
English
Format
Accession Number
TU14968
Shelf Location
Archives, The Learning Commons, 12F, Henry Sy Sr. Hall
Physical Description
175, [61] leaves : ill. ; 28 cm.
Keywords
Rubber industry and trade; Production management; Production planning; Production control; Production engineering; Manufacturing processes; Corporations--Finance; Industrial efficiency; Titan Rubber Industrial Manufacturing Corporation
Recommended Citation
Chua, P., Dee, R. C., & Floresca, E. C. (2008). A system study on the production department of Titan Rubber Industrial Manufacturing Corporation. Retrieved from https://animorepository.dlsu.edu.ph/etd_bachelors/8692