A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.
Date of Publication
1991
Document Type
Bachelor's Thesis
Degree Name
Bachelor of Science in Industrial Engineering
College
Gokongwei College of Engineering
Department/Unit
Industrial and Systems Engineering
Abstract/Summary
Remerco Garments Manufacturing, Inc. is a company that manufactures excellent quality children wears. The firm caters only to foreign buyers as far as the job orders are concern. Being in the garment business for almost 20 years already does not spare the company from problems occuring during production.From occular inspections and observations of the firm's present system, it was disclosed that delays in the production department of the company had created disadvantageous effects. These effects range from late shipping of orders which could lead to cancellation of orders and rush in production which could naturally lead to overtime. All of which would definitely cost the company a lot of money.After analyzing the present system of the company, it was found out that the true causes of the delay in production is the poor and unrealistic scheduling and monitoring system of the company.In the proposed system, a time study was constructed that would allow the company to make a proper and realistic scheduling in order to meet the shipment dates of the job orders. Also, monitoring tools were provided in order to perceive In-House Processes presently undergoing stages of work in the working area.
Abstract Format
html
Language
English
Format
Accession Number
TU05465
Shelf Location
Archives, The Learning Commons, 12F, Henry Sy Sr. Hall
Physical Description
87 leaves
Recommended Citation
Bonoan, B. R. (1991). A systems study on the scheduling and monitoring of Remerco Garments Manufacturing, Inc.. Retrieved from https://animorepository.dlsu.edu.ph/etd_bachelors/1898