The factors that cause delays of on site construction of highrise buildings in Metro Manila.

Date of Publication

2001

Document Type

Bachelor's Thesis

Degree Name

Bachelor of Science in Civil Engineering

College

Gokongwei College of Engineering

Department/Unit

Civil Engineering

Abstract/Summary

Abstract. A survey was utilized to know the top twenty delay factors that affect the construction of high-rise buildings in Metro Manila. Causes and effects of each factors where discussed and possible solution were recommended according to the suggestions of the engineers who were interviewed.

Included here are the top-twenty delay factors that contribute to the delay of high rise buildings. Their distribution according to the three major construction fields, namely Management and Labor, Site Lay-out and Organization and Materials and Equipment was analyzed. Included is the list of top twenty delay sub-factors for a more detailed understanding of the events contributing the most effect. Delays were also grouped based on the activity that it affected or where it could be encountered.

Abstract Format

html

Accession Number

TU10789

Shelf Location

Archives, The Learning Commons, 12F Henry Sy Sr. Hall

Physical Description

44 numb. leaves ; Computer print-out.